- Akkaraju, Sangetta, Integrating Quality Management Strategies
in Customer and Supplier Relationships Based on ISO Standards, Spring
2001.
- Gallatti, Dena W., Private Fleet Quality Management And Optimization
Strategies,
Fall 2001.
- Boudreaux, Jude R., Quality Inspection Planning of Ferrous
Oilfield Related Components Using Magnetic Particle and Ultrasonic Testing
Technology, Fall
2001.
- Headley, Brian J., A Value Engineering Approach for Development
Projects,
Fall 2001.
- Steele, Rex H., Jr., Benchmarking Application to Enhance Optimal
Throughput and Ensure Customer Satisfaction, Spring 2000.
- Boudreaux,
Kevin, Procedure to Implement a New Production Line in Glass
Industry,
Spring 2000.
- Krishnamurthy, Subramaniam, Statistical Aspects of Capital
Budgeting,
Spring 1996.
- Steward, Brian, A Practical Risk Analysis Model for Determining
Optimum Completion Technique, Fall 1994.
- Wiwakanond, Kittipong, Simulation
of an Electronic Manufacturing System with Two-card Kanban, Fall
1994.
- Alameddine, Mustapha, Simulation Study for the Selection and
Design of Material Handling Devices in Flexible Manufacturing
Systems,
Spring 1993.
- Hennigan, Stephen, Psychological Considerations for
Implementation of Total Quality Management Program,
Fall 1991.
- Muralidharan,
Ranganathan, Multivariate Ozone Models,
Summer 1991.
- Sengupta, Sujit, Statistical Properties of Present
Worth Models,
Summer 1991.
- Strother, James, Methods for Constrained Resource Scheduling
in Project Management,
Summer 1991.
- Tanthawichian, Wisan, Combination Forecasting Procedures
for Aggregate Crude Oil and Natural Gas Production
in Louisiana,
Summer 1991.
- Sirichoompun, Adisorn, Inspection Allocation and
Scheduling Rules in Flexible Manufacturing Systems, Spring
1991.
- Srisurapol, Pensri, Sequencing and Location Heuristics
for RobotPCB Assembly,
Spring 1991.
- Suriyakriangkai, Somsak, Forecasting of Dow
Jones Averages for Industrials, Utilities,
and Bonds in the 1980's,
Spring 1991.
- Kobkurkul, Supadit, A Study
of Assembly Line Balancing Heuristics,
Fall 1990.
- Ruangdet, Manasvee, Evaluation of MRP Lot Sizing
Algorithms with Multiple Purchase Discounts,
Fall 1990.
- Goh,
Guan Chong, Just-In-Time and MRP Scheduling,
Summer 1990.
- Apande, Emmanuel, A Study of Dispatching
Automated Guided Vehicles in Assembly
Systems,
Spring 1990.
- Wibowo, Timotius, INCID: An Expert Inventory Control System for Independent Demand Problems, Spring 1990.
- Irion, Robert, A Study of Heuristics
for Inspection Location in Flexible Manufacturing Systems, Fall
1989.
- Mongalo, Marco, A Comparative Study of Methods for Probabilistic
Project Scheduling,
Fall 1989.
- Boatham, Thanet, Lagrangian Relaxation
Method with Linear Programming
System,
Spring 1989.
- Juntrapirut,
Sarayuth, Forecasting of Oil and Gas Production in Louisiana
by Combining Forecasts
from Short Term and Long Term Models,
Spring1989.
- McClelland,
Mark, The Just-In-Time Scheduling System,
Spring1989.
- Sittisathanchai,
Sinchai, Analysis of the Tracking Signal,
Spring 1989.
- Wongpipathpong,
Narong, Oil and Natural Gas Forecasting in Louisiana
Using an Optimal Dynamic Smoothing Parameter, Spring
1989.
- Ross, Jerre, Forecast Simulation of Oil
and Gas Production
for the State of Louisiana Using Combination Forecast of Bates
and Granger, Fall
1988.
- Tanticharoen,
Ponlawat, Empirical Examination of the Effects of Error
Mean, Error Standard Deviation, and Smoothing Parameter on the TrackingSignal,
Fall 1988.
- Chaowadee,
Botchai, Oil and Gas Production Forecasting,
Spring 1988.
- Ser,
Lok, A Comparison Of Box-Jenkins Method Versus Locally Linear
Method On Trend Time Series,
Spring 1988.
- Sirichumsang,
Komsan, Advanced
Analysis
of a Crashing
Procedure
Using Linear
Regression
To Find
Starting Bases
For
Linear
Programs,
Fall 1987.
- Tan,
Wai
Lin, Computer
Assisted
Instruction
In Engineering
Economics:
Simulated
Equivalence
Problems,
Spring
1987.
- Ajueyitsi,
Lucky
L.
A., Adaptive
Smoothing
Control
With
Special
Attention
To
A Three-Parameter
Factorial
Design
Adaptive
Smoothing
Technique,
Fall
1986.
- El-Kassar,
Abdul-Nasser, A
Comparison
of
Three
Methods
for
Matrix
Inversion
on
Microcomputers:
Gaussian
Elimination,
Cholesky
Decomposition,
and
Congruent
Transformation,
Fall 1986.
- Poommarapan,
Popanit, A
Crashing Procedure
Using Linear Regression
to Find Starting
Bases for
Linear Programs,
Fall 1986.
- Prateepswang,
Precha, Computer Routine To Simulate Time Series,
Spring
1986.
- Elfessi
Abdulaziz
M., Direct Smoothing Routine For Forecasting Time Series
Models Including Polynomial And Trigonometric Functions,
Spring 1985.
- Chalermskulratn,
Vichai, Computer Routines for Three Forecasting Techniques:
Holt's Linear Smoothing, Tukey's Higher Order Exponential
Smoothing,and Winters' Seasonal Exponential Smoothing,
Fall
1984.
- Savoy,
Richard
Pierre, Analysis and Design of an Interactive Interpreter
for Operations Research Applications,
Fall 1978.
|
- Gaspard, Anthony J., TQM Based Equipment Maintenance Program for Oilfield
Service Companies, Fall 2001.
- Magar, Kristian Lee, Utilizing Quality Tools to Achieve Continuous Safety
Improvement, December, 2000.
- Beekharry, Parvin, Implementing a Quality Control Program in Fiberglass Fabrication
Industry, August, 2000.
- Dugas, Casey, Development of a Reliability Based Aircraft MaintenanceProgram,
December, 1998.
- Castille, Steven T., The Design and Development of an Integrated Computer-Aided
Diagnostic Decision Support System (DDSS), Summer 1998.
- Maneesavet, Roongroj, Scheduling and Dispatching Decisionsfor Rail Guided
Vehicles in a Flexible Manufacturing System, Spring 1996.
- Srisawat, Teerachat, Interaction Between System Design And Composite Pick-Up/Drop-Off
Rules In Multiple-Load Automated Guided Vehicle Systems, Spring 1996.
- Poopraset, Monnapop, Investment Simulator for Capital Budgeting, Fall
1995.
- Tangjarukij, Montri, Load Selection Heuristics In Multiple-Load AutomatedGuided
Vehicle Systems, Fall 1994.
- Yingpunyachok, Charoenchai, Scheduling Of Rail-Guided VehiclesInThe Load/Unload
Area Of A Flexible Manufacturing System, Fall 1994.
- Wang, Xinchun, A Decision Support System For Production Scheduling In Continuous
Process Manufacturing Plants, Summer 1994.
- Chavarria, Francisco, Scheduling Operations In An Apparel Cutting Center,
Fall 1994.
- Unnikrishnan, Srinath, Allocation And Assignment Of Inspection Operations
In Multistage Production Systems, Fall 1994.
- Wu, Danyu, Intelligent Real-Time Control Of Advanced Manufacturing Systems,
Fall 1994.
- Kessy, John I., A Methodology For The Optimization Of Highway Needs And Priorities,
Summer 1994.
- Kinasha, Elisifa K., Project Management Practices In Tanzania, Summer
1994.
- Kleawpatinon, Kraisorn, Part-Selection Modelling And Solution Heuristics For
Production Planning Of Flexible Manufacturing Systems, Summer 1994.
- Thoranam, Srikanth, Tool Replenishment Strategies For Disk-Type AndChain-Type
Magazines Of Flexible Machining Systems, Summer 1994.
- Thinphangnga, Satanapa, Reliability Modelling For Flexible Manufacturing Systems,
Spring 1994.
- Su, Qi, Gantry Robot Sequencing For Automated Serial Production Lines,
Fall 1993.
- Conner, Stephen L., A Study Of Future Natural Gas Supply And Demand, Spring
1993.
- Xu, Dandan, Redundant Tooling Algorithms And Tool Replenishment Strategies
For Flexible Manufacturing Systems, Spring 1993
- Dunham, David A., Design And Development Of Gismeaux: A Graphical Intelligent
System For Management Of Equipment And Auxiliaries, Fall 1992.
- Guichard, III, Joel A., Performance Evaluation Of Heuristic Rules To Select
The Constraint To Be Relaxed In a Lagrangian Relaxation, Spring 1992.
- Kumat, Amit, Roughness Analysis Of Grade Breaks At Intersections, Spring
1992.
- Lee, Moon-Kui, Grouping And Placement Of Workstations In Balanced-Tandem AGV
Systems, Spring 1992.
- Onochie, Joseph Ikemefuna, Forecasting Oil And Natural Gas Production In Louisiana,
Fall 1983.
- Vickery, Adrian Redman, Design for a Real-Time Interpretive System, Spring
1980.
- Ashley, Clyde Edwin, Estimation of Makespan as a Function of Project Parameters,
Spring 1978.
|