Home Search Index A-Z Contact Us Portal
News About Us Academics Student Life Library Research Athletics
University of Louisiana at Lafayette Engineering and Technology Management
       
Prospective Students
Current Students
Alumni, Donors & Friends
Visitors
Faculty & Staff
Dr. E. Joseph Savoie Begins Presidency
home | programs | faculty & staff | alumni | reports & theses
 
Reports & Theses
 
 
 
Reports The following are examples of reports from EMGT students.
 
  • Akkaraju, Sangetta, Integrating Quality Management Strategies in Customer and Supplier Relationships Based on ISO Standards, Spring 2001.

  • Gallatti, Dena W., Private Fleet Quality Management And Optimization Strategies, Fall 2001.

  • Boudreaux, Jude R., Quality Inspection Planning of Ferrous Oilfield Related Components Using Magnetic Particle and Ultrasonic Testing Technology, Fall 2001.

  • Headley, Brian J., A Value Engineering Approach for Development Projects, Fall 2001.

  • Steele, Rex H., Jr., Benchmarking Application to Enhance Optimal Throughput and Ensure Customer Satisfaction, Spring 2000.

  • Boudreaux, Kevin, Procedure to Implement a New Production Line in Glass Industry, Spring 2000.

  • Krishnamurthy, Subramaniam, Statistical Aspects of Capital Budgeting, Spring 1996.

  • Steward, Brian, A Practical Risk Analysis Model for Determining Optimum Completion Technique, Fall 1994.

  • Wiwakanond, Kittipong, Simulation of an Electronic Manufacturing System with Two-card Kanban, Fall 1994.

  • Alameddine, Mustapha, Simulation Study for the Selection and Design of Material Handling Devices in Flexible Manufacturing Systems, Spring 1993.

  • Hennigan, Stephen, Psychological Considerations for Implementation of Total Quality Management Program, Fall 1991.

  • Muralidharan, Ranganathan, Multivariate Ozone Models, Summer 1991.

  • Sengupta, Sujit, Statistical Properties of Present Worth Models, Summer 1991.

  • Strother, James, Methods for Constrained Resource Scheduling in Project Management, Summer 1991.

  • Tanthawichian, Wisan, Combination Forecasting Procedures for Aggregate Crude Oil and Natural Gas Production in Louisiana, Summer 1991.

  • Sirichoompun, Adisorn, Inspection Allocation and Scheduling Rules in Flexible Manufacturing Systems, Spring 1991.

  • Srisurapol, Pensri, Sequencing and Location Heuristics for RobotPCB Assembly, Spring 1991.

  • Suriyakriangkai, Somsak, Forecasting of Dow Jones Averages for Industrials, Utilities, and Bonds in the 1980's, Spring 1991.

  • Kobkurkul, Supadit, A Study of Assembly Line Balancing Heuristics, Fall 1990.

  • Ruangdet, Manasvee, Evaluation of MRP Lot Sizing Algorithms with Multiple Purchase Discounts, Fall 1990.

  • Goh, Guan Chong, Just-In-Time and MRP Scheduling, Summer 1990.

  • Apande, Emmanuel, A Study of Dispatching Automated Guided Vehicles in Assembly Systems, Spring 1990.

  • Wibowo, Timotius, INCID: An Expert Inventory Control System for Independent Demand Problems, Spring 1990.

  • Irion, Robert, A Study of Heuristics for Inspection Location in Flexible Manufacturing Systems, Fall 1989.

  • Mongalo, Marco, A Comparative Study of Methods for Probabilistic Project Scheduling, Fall 1989.

  • Boatham, Thanet, Lagrangian Relaxation Method with Linear Programming System, Spring 1989.

  • Juntrapirut, Sarayuth, Forecasting of Oil and Gas Production in Louisiana by Combining Forecasts from Short Term and Long Term Models, Spring1989.

  • McClelland, Mark, The Just-In-Time Scheduling System, Spring1989.

  • Sittisathanchai, Sinchai, Analysis of the Tracking Signal, Spring 1989.

  • Wongpipathpong, Narong, Oil and Natural Gas Forecasting in Louisiana Using an Optimal Dynamic Smoothing Parameter, Spring 1989.

  • Ross, Jerre, Forecast Simulation of Oil and Gas Production for the State of Louisiana Using Combination Forecast of Bates and Granger, Fall 1988.

  • Tanticharoen, Ponlawat, Empirical Examination of the Effects of Error Mean, Error Standard Deviation, and Smoothing Parameter on the TrackingSignal, Fall 1988.

  • Chaowadee, Botchai, Oil and Gas Production Forecasting, Spring 1988.

  • Ser, Lok, A Comparison Of Box-Jenkins Method Versus Locally Linear Method On Trend Time Series, Spring 1988.

  • Sirichumsang, Komsan, Advanced Analysis of a Crashing Procedure Using Linear Regression To Find Starting Bases For Linear Programs, Fall 1987.

  • Tan, Wai Lin, Computer Assisted Instruction In Engineering Economics: Simulated Equivalence Problems, Spring 1987.

  • Ajueyitsi, Lucky L. A., Adaptive Smoothing Control With Special Attention To A Three-Parameter Factorial Design Adaptive Smoothing Technique, Fall 1986.

  • El-Kassar, Abdul-Nasser, A Comparison of Three Methods for Matrix Inversion on Microcomputers: Gaussian Elimination, Cholesky Decomposition, and Congruent Transformation, Fall 1986.

  • Poommarapan, Popanit, A Crashing Procedure Using Linear Regression to Find Starting Bases for Linear Programs, Fall 1986.

  • Prateepswang, Precha, Computer Routine To Simulate Time Series, Spring 1986.

  • Elfessi Abdulaziz M., Direct Smoothing Routine For Forecasting Time Series Models Including Polynomial And Trigonometric Functions, Spring 1985.

  • Chalermskulratn, Vichai, Computer Routines for Three Forecasting Techniques: Holt's Linear Smoothing, Tukey's Higher Order Exponential Smoothing,and Winters' Seasonal Exponential Smoothing, Fall 1984.

  • Savoy, Richard Pierre, Analysis and Design of an Interactive Interpreter for Operations Research Applications, Fall 1978.
 
 
Theses The following are examples of theses from EMGT students.
 
  • Gaspard, Anthony J., TQM Based Equipment Maintenance Program for Oilfield Service Companies, Fall 2001.

  • Magar, Kristian Lee, Utilizing Quality Tools to Achieve Continuous Safety Improvement, December, 2000.

  • Beekharry, Parvin, Implementing a Quality Control Program in Fiberglass Fabrication Industry, August, 2000.

  • Dugas, Casey, Development of a Reliability Based Aircraft MaintenanceProgram, December, 1998.

  • Castille, Steven T., The Design and Development of an Integrated Computer-Aided Diagnostic Decision Support System (DDSS), Summer 1998.

  • Maneesavet, Roongroj, Scheduling and Dispatching Decisionsfor Rail Guided Vehicles in a Flexible Manufacturing System, Spring 1996.

  • Srisawat, Teerachat, Interaction Between System Design And Composite Pick-Up/Drop-Off Rules In Multiple-Load Automated Guided Vehicle Systems, Spring 1996.

  • Poopraset, Monnapop, Investment Simulator for Capital Budgeting, Fall 1995.

  • Tangjarukij, Montri, Load Selection Heuristics In Multiple-Load AutomatedGuided Vehicle Systems, Fall 1994.

  • Yingpunyachok, Charoenchai, Scheduling Of Rail-Guided VehiclesInThe Load/Unload Area Of A Flexible Manufacturing System, Fall 1994.

  • Wang, Xinchun, A Decision Support System For Production Scheduling In Continuous Process Manufacturing Plants, Summer 1994.

  • Chavarria, Francisco, Scheduling Operations In An Apparel Cutting Center, Fall 1994.

  • Unnikrishnan, Srinath, Allocation And Assignment Of Inspection Operations In Multistage Production Systems, Fall 1994.

  • Wu, Danyu, Intelligent Real-Time Control Of Advanced Manufacturing Systems, Fall 1994.

  • Kessy, John I., A Methodology For The Optimization Of Highway Needs And Priorities, Summer 1994.

  • Kinasha, Elisifa K., Project Management Practices In Tanzania, Summer 1994.

  • Kleawpatinon, Kraisorn, Part-Selection Modelling And Solution Heuristics For Production Planning Of Flexible Manufacturing Systems, Summer 1994.

  • Thoranam, Srikanth, Tool Replenishment Strategies For Disk-Type AndChain-Type Magazines Of Flexible Machining Systems, Summer 1994.

  • Thinphangnga, Satanapa, Reliability Modelling For Flexible Manufacturing Systems, Spring 1994.

  • Su, Qi, Gantry Robot Sequencing For Automated Serial Production Lines, Fall 1993.

  • Conner, Stephen L., A Study Of Future Natural Gas Supply And Demand, Spring 1993.

  • Xu, Dandan, Redundant Tooling Algorithms And Tool Replenishment Strategies For Flexible Manufacturing Systems, Spring 1993

  • Dunham, David A., Design And Development Of Gismeaux: A Graphical Intelligent System For Management Of Equipment And Auxiliaries, Fall 1992.

  • Guichard, III, Joel A., Performance Evaluation Of Heuristic Rules To Select The Constraint To Be Relaxed In a Lagrangian Relaxation, Spring 1992.

  • Kumat, Amit, Roughness Analysis Of Grade Breaks At Intersections, Spring 1992.

  • Lee, Moon-Kui, Grouping And Placement Of Workstations In Balanced-Tandem AGV Systems, Spring 1992.

  • Onochie, Joseph Ikemefuna, Forecasting Oil And Natural Gas Production In Louisiana, Fall 1983.

  • Vickery, Adrian Redman, Design for a Real-Time Interpretive System, Spring 1980.

  • Ashley, Clyde Edwin, Estimation of Makespan as a Function of Project Parameters, Spring 1978.
 

Document last revised Friday, August 27, 2004 10:30 AM

Copyright 2003 by the University of Louisiana at Lafayette
Engr & Tech Mgmt, P.O. Box 42250, Lafayette LA 70504
Phone: 337/482-6485 · E-Mail: EmgtProg@louisiana.edu
Location: C.L. Rougeou Hall, Room 255 · Fax: 337/482-6661